mhldrillpipe
Petroleum
- May 21, 2007
- 7
Guys
API pure torsion fomula Q = [0.096167 J Ym]/D, where J is polar moment of inertia, J=pi/32(D4-d4), Y minimum yield of material and D is outside diameter. d is inside diamenter of tube.
If a wash out in drill pipe occurs the size of the wash out, i.e. wash out area, can be estimated with hydraulic calculations.
So if an area of wash out is estimated in drill string tube, how to set a new limit for torque in DP when pulling out of hole (praying the tube does not twist off)?? any ideas or suggestions/experiences?
hoping for reply
thanks
API pure torsion fomula Q = [0.096167 J Ym]/D, where J is polar moment of inertia, J=pi/32(D4-d4), Y minimum yield of material and D is outside diameter. d is inside diamenter of tube.
If a wash out in drill pipe occurs the size of the wash out, i.e. wash out area, can be estimated with hydraulic calculations.
So if an area of wash out is estimated in drill string tube, how to set a new limit for torque in DP when pulling out of hole (praying the tube does not twist off)?? any ideas or suggestions/experiences?
hoping for reply
thanks