Jul 28, 2015 #1 sw23cyp Mechanical Joined Aug 31, 2011 Messages 27 Location US According to 6.3.4.3 Heat Treat Condition, testing shall be done with the test weldment in the PWHT condition. Does this requirement apply to the WPQ as well as the PQR? Do the WPQ require impact testing?
According to 6.3.4.3 Heat Treat Condition, testing shall be done with the test weldment in the PWHT condition. Does this requirement apply to the WPQ as well as the PQR? Do the WPQ require impact testing?