Anyone ever see a double positive tolerance? (e.g 1.000 +0.005 +0.008)
I've always thought the target value must be between the maximum and minumum value; and was selected by the engineer based on maximizing yield depending on how the part would be made, and on maximizing performance of the final assembly. The tolerances could be symmetric +/- 0.003, or they could be asymmetric +0.003 - 0.000, but I've never seen double positive tolerance, or double negative before.
Did I miss something in GD&T class?
I've always thought the target value must be between the maximum and minumum value; and was selected by the engineer based on maximizing yield depending on how the part would be made, and on maximizing performance of the final assembly. The tolerances could be symmetric +/- 0.003, or they could be asymmetric +0.003 - 0.000, but I've never seen double positive tolerance, or double negative before.
Did I miss something in GD&T class?