WILDWINGS27
Civil/Environmental
- Mar 5, 2006
- 30
I have read that the Time Interval needs to be less than 20% the time to peak. Is this correct? If so, I assume that means 20% of the time to peak of the Unit Hydrograph. Can anyone confirm my statement?