Pivotman
Industrial
- Jan 19, 2005
- 15
I have been assigned the task of hooking up Andon lights on several machines and departments. I need to have two strobes one for maintenance and one for inspector. I am considering using a plc to track there state potentially so the system could be monitored at a central location. What is the longest I can run the sensors back to a central plc. Or would it make sense to have a plc in each department. Most of our machines are all relay logic and 120vac. Any sensors I would add I was planning on makeing 24vdc for safety and reliablity. Any other ideas would be appreaciated.