The reboiler is operated as a kettle reboiler, with lean amine overflowing a weir in the heating bundle section.
Level downstream of the weir (which is at the same level as the bottom lean amine sump of the stripper) should also take up the thermal expansion volume of the entire amine solution closed loop inventory going up from cold temp conditions to normal operating temp.
Maintenance volume holdup for the circuit is usually provided in a separate rich amine storage tank. This is unlike a TEG unit, where the maintenance volume holdup is provided in the lean TEG surge drum - in an amine unit, there is no surge drum