I am trying to figure out how this section applies to a square 30" spandrel column with (3) 36" deep beams (2 fascia/spandrel and 1 interior) framing into the column. *I* think that ties need to start at 1/2*S top and bottom of the slab, since there is at least 1 (exactly 1 in this case) free edges. A much more experienced engineer than I said that every detail he has seen and used for years would have terminated the column ties 3" from the btm reinforcement of the most shallow beam (in this case they are all equal).
The commentary has this section's verbiage dated to at least 1983, so I am a bit confused about the apparent disconnect between what it says, and what my elder engineer says.
Thank you.
"It is imperative Cunth doesn't get his hands on those codes."
The commentary has this section's verbiage dated to at least 1983, so I am a bit confused about the apparent disconnect between what it says, and what my elder engineer says.
Thank you.
"It is imperative Cunth doesn't get his hands on those codes."