Eng-Tips is the largest forum for Engineering Professionals on the Internet.

Members share and learn making Eng-Tips Forums the best source of engineering information on the Internet!

  • Congratulations JStephen on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Acceptable leak rate - CDU column

Status
Not open for further replies.

Milutin

Chemical
Joined
Jul 7, 2006
Messages
152
Location
RS
Dear all

Does anybody have idea of acceptable leak rate for partial draw of tray?

Tray is for light gas oil and puparound drawing. Rate of LGO is about 80m3/h and 400m3/h for PA. Column is 6m diameter. Tray has two chimneys and two overflow weirs 1.5m high.

Regards
 
In a draw off tray the drop in water level shall not exceed 25mm in 5 minutes.
 
Does the previous statement apply for all mounted chimney/partial draw-off trays?

What should be the initial water level, before the leak test is going to start? The maximum one, 50% of max. level, or something else? Where can we find standardized procedure for tray leak testing?
 

The usual leak test procedure for draw-off trays is as fallows:

Block drain holes with putty.
Fill with water (check water quality - maximum chlorides).
Mark water level (above 50%) and leave for 30 minutes; level shall not drop by more than 50 mm, unless otherwise specified.
Allow water to drain and check flow (slope of gutters/trough).
Remove all putty from drain holes.
Check cleanliness and arrange acceptance.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top