Hi,
Could you assist me about the considerations to take into account both technical and normative, for drilling and to thread an A105N blind flange existing at a pipeline end..??
The idea is to install an array of eccentric drain, because it is necessary to drill and connect a threaded pipe with check and ball valve. For drain water after hydrotest.
The pipeline is for regular gasoline at 8.6 bar (125psi) MOP.
Pipe API 5L Gr. B DN 12" Sch. 60
The blind is ASME B16.5 A105N DN 12" Class 150
The drain is proposed of pipe ASTM A106 Gr B Sch. 80, threaded with seal weld. Check and ball valve DN 1" rating 1500 SW.
Thanks in advance
Could you assist me about the considerations to take into account both technical and normative, for drilling and to thread an A105N blind flange existing at a pipeline end..??
The idea is to install an array of eccentric drain, because it is necessary to drill and connect a threaded pipe with check and ball valve. For drain water after hydrotest.
The pipeline is for regular gasoline at 8.6 bar (125psi) MOP.
Pipe API 5L Gr. B DN 12" Sch. 60
The blind is ASME B16.5 A105N DN 12" Class 150
The drain is proposed of pipe ASTM A106 Gr B Sch. 80, threaded with seal weld. Check and ball valve DN 1" rating 1500 SW.
Thanks in advance