If I compare NDT criteria B31.3 & 8, pipelines would appear to either have considerably worse service conditions, or a very much lower tolerance for faults.
B31.8
826.3 The following minimum number of field butt welds shall be selected on a random basis by the operating company from each day’s construction for examination.
(1) 10% of welds in Location Class 1
(2) 15% of welds in Location Class 2
(3) 40% of welds in Location Class 3
(4) 75% of welds in Location Class 4
(5) 100% of the welds in compressor stations, and
at major or navigable river crossings, major highway
crossings, and railroad crossings, if practical, but in no
case less than 90%. All tie-in welds not subjected to a
pressure proof test shall be examined.
A826.2.1 (Offshore)
90-100%
B31.4
Generally 10%, except that all welds in the following locations (or a min of 90% of the welds, if some are inaccessible) shall be completely inspected;
(a) within populated areas such as residential
subdivisions, shopping centers, and designated commercial
and industrial areas
(b) river, lake, and stream crossings within the
area subject to frequent inundation; and river, lake, and
stream crossings on bridges
(c) railroad or public highway rights-of-way,
including tunnels, bridges, and overhead railroad and
road crossings
(d) offshore and inland coastal waters
(e) old girth welds in used pipe
(f) tie-in girth welds not