EITZM
Civil/Environmental
- Nov 21, 2016
- 9
A contractor is questioning the possibility of installing a 3.5' Allan block wall at the bottom of a dry pond with an extra 3 foot of storage at 3:1 slope backfill without a professional engineer's design. The plans call for a design's professional design for walls over 4'. Should the contractor submit a PE design or would the typical detail suffice for this application. Feedback would be greatly appreciated. Thanks