Hi All,
My company manufactures 2ft x 4ft all the way up to 3ft x 8ft ASME CODE pressure vessels. We manufacture about 15 a week and currently have to have the AI inspect the vessel before we weld the second head on and then again after it is welded/at pressure test.
Is there a way to design the vessels so that we do not have to do 2 separate inspections per vessel?