We will be checking some existing steel I beams and channels for a building in Chicago area built in 1916 for 2-3" of additional light weight topping. From the historical steel area it appears that Fy used was likely 24 ksi. The beams are fully braced. I am trying to figure out if I need to use the green book or the black book for steel check. I don't know what allowable Fb would they have used back then, 0.66 max may be?