12% increased for temporary works BS8002 cl. 4.4.4.2

Status
Not open for further replies.

Trop99

Geotechnical
Joined
Apr 9, 2014
Messages
4
Location
SG
in BS8002 cl. 4.4.4.2

"The allowable stresses given therein may be increased by 12 % for temporary works of short duration."

Does this clause refer to only steel sheet pile or related temporary works such as strutting, waler etc?
 