I don't have info on equipment. Yes, there is floor drains & I can only assume crew will squeegy the water on the floor to drains.
Ideally, we would like to use a desiccant wheel, but budget won't allow. So, looks like we need to dry the supply air as much as possible & exhaust the vapor out.
Most surfaces are to be dry. The crew will go thru & wipe areas that have drops.
Equipment is stainless steel & floor is an epoxy finish. Elevated temps would be around 90F/35% RH.
Need help on 2 things:
1 - Best (cost & time) method to dry out a room after it has been thru a washdown process?
2 - How long until room is relatively dry & at design conditions?
Some additional background. Room (40Lx40Wx20H) will be washed down once everyday. Owner would like to have room...