Thanks again for the replies
There are no buildings/infrastructure within the flood zone. The matrix material which is borrow from nearby is Sandy Clay SILT 20/20/60. Good point about the strength increase of the cured mix, so the dam will probably be strong enough after 28 days or less. I...