  1. Trillers

    Shear Resistance of Rebar in Compacted Soil

    WinelandV, We are in the same situation with a very similar scenario. Well-compacted gravel (5,490# compressive strength), 20" thick. The forms use #5 rebar in the same fashion as the pin you described. Just was never able to figure out how to calculate the shear capacity and pullout...
  2. Trillers

    Shear Resistance of Rebar in Compacted Soil

    To secure formwork into compacted soil the contractor is using a 2x4 base plate and using #5 rebar driven 16" into the ground to anchor the base plate. The loading on this will be the horizontal load from wind forces and horizontal forces produced by the uncured concrete and the vertical forces...
  3. Trillers

    Application of Wind Forces at Top of Wall Form

    I was looking at ASCE/SEI 37-14, 6.2.3 Accelerated Wind region which states that at "top edges of enclosures, pressures shall be assumed to act upward as well as horizontally". This citation might not apply to the formwork we are designing. The other reference is ACI 347-04, 2.2.3.2 - which...
  4. Trillers

    Application of Wind Forces at Top of Wall Form

    Both ASCE and ACI state that a minimum wind load should be applied at the top of a vertical wall or column form if I’m reading correctly. It doesn’t seem practical to apply the wind loading at mid-depth if we’re required to add a minimum wind load ar the top of the form wall. I guess then...
  5. Trillers

    Application of Wind Forces at Top of Wall Form

    I should clarify - in stating the wind force should be applied as if triangularly distributed this would place the resultant at 1/3 below the top of form, not the top of form where I believe it should be. Thanks.
  6. Trillers

    Application of Wind Forces at Top of Wall Form

    I am designing a wall form system for a low wall (less than 8'). I applied the wind force at the top of the form, but the reviewer indicated this force should be applied as if the wind force is triangularly distributed. The references I have seen all indicate a minimum wind load "applied at...
  7. Trillers

    Risk Category for Temporary Formwork

    Thanks guys- ASCE 37 has been my Primary reference but I didn’t see the CAt II for temp structures. I’ll recheck. For now I’ll eat burnt turkey!!
  8. Trillers

    Risk Category for Temporary Formwork

    I am designing formwork for concrete walls and roof of only one-story heights. In doing so I assigned Risk Category 1 since the formwork is a temporary structure. However the QC reviewer insists that wind loading, even for temporary formwork, must comply with the Risk Category of the...
  9. Trillers

    Spliced Beam Reactions

    Gentlemen:. Thanks all for the insight and wisdom. I will now go back to the drawing board bruised but wiseR.
  10. Trillers

    Spliced Beam Reactions

    Sorry about the absence folks....not been abducted although some swear that UFO sightings are definitely on the rise in our region. Delay in responding is due to being out of office and the time zone difference. Anyway I guess my post definitely confused a lot of you. To clarify on...
  11. Trillers

    Spliced Beam Reactions

    Greetings: I am designing a steel beam to support a 16" waterline crossing over a creek. The waterline will be supported by the I-Beam by hangers at 8' OC which I analyzed both ways - point loads and uniform load. The clear span is 72 ft. Because of limited space the contractor can only...
  12. Trillers

    Software Suite - Legitimate?

    Has anyone in this forum had experience with the Daniel T. Li suite of spreadsheets? We are considering purchasing a license but have not been able to find reviews on this spreadsheet based suite. I personally am impressed with a couple of trial versions we have run, but would like to confirm...
  13. Trillers

    Rust Spots on Exterior of CIP Water Tank

    Greetings HOKIE and JAE- In full agreement with you on the coating. Regarding the rusting - there was no spalling or cracking near the origin of the stains, so tend to think it is tie wire or form nails "inadvertently" left in place. Thanks for the input gents - be safe and well. Trillers.
  14. Trillers

    Rust Spots on Exterior of CIP Water Tank

    Greetings - We are working on rehabilitating an existing concrete water tank 24'L x 12'W x 10'H constructed in 1998. The tank appears to be in fairly good shape and the owner indicated no leakage prior to it being emptied in 2017. We want to make sure the tank is OK for recommissioning so...
  15. Trillers

    Basement Parking Lot Striping

    Greetings: One of our clients is completing a residential mid-rise apartment project for which most of the parking spaces are in the basement level. Instead of striping to delineate parking stalls, the developer would like to use reflective raised pavement markers (buttons). The building...
  16. Trillers

    C&C and MWFRS Wind

    TehMightyEngineer, we recently had a C&C issue come up regarding downspouts. If the 4" aluminum downspout is flush against the building which factors apply? In this case I just assumed full frontal assault from the wind and designed the anchorage for that since shear would be the concern. The...
  17. Trillers

    Concrete topping on Precast Double tees

    Teguci, could you clarify the depth at which you suggest the WWM should be located? This is actually my first preference for the topping temperature control. Did you mean 1" from top or from in-depth? We do have a "stop" if you will in the form of a CIP FASCIA which will be cast with the...
  18. Trillers

    Concrete topping on Precast Double tees

    Hafa Adai Ingenuity and All, yes - this is Guam. The KMart deck has done quite well but they have experienced some cracks and leakage over the years. I am really concerned about this because of the solar panel racking installation. We will be installing sealant over a backer rod in the DT...
  19. Trillers

    Concrete topping on Precast Double tees

    Greetings: I am designing the structure for a 360’ x 124' warehouse. The structural system consists of pre-cast concrete wall panels and double tees on the roof. The PC DT's are supported by the PC wall panels along the building exterior and by a continuous inverted T beam at the apex ridge...
  20. Trillers

    Downspout Anchorage

    Thanks guys for for all your thoughts. I did consider the exemptions, but then taking into consideration what wannabeSE discussed about seismic bracing of downspouts assumed full - what could possibly be the forces? Seismic weight applied at the base of the downspout? Since the downspouts are...