The concern arises from the fact that there could be corrosion occurring causing inadequate material for welding. Cutting into the pipe and finding a thinned situation would not be ideal as HF Modified piping is not readily available. With this metallurgy there should not be an issue with...
Good day,
We have a fair amount of HF modified pipe in our facility and are currently in the midst of revamp work where tie-ins and pipe rework is required. Prior to cutting pipe, the project management contractor is requiring a thickness reading to ensure adequate material is present for...