here the card board is kinda where i was thinking the flashing would go? but only if necessary. I just really think that at the metal deck is where its going to crack for sure. the cold joint i hope to bond with some type of primmer or epoxy before we pour that next...
even if we did get a 2 inch curb there doesn't there still need to be flashing on top of the deck pan? i wanted to run the flashing over the deck and just on the inside of the foam block. Even if we were able to get a curb formed up there i kinda feel as though the concrete is going to crack...
Looking at the pdf i have enclosed you can see that yes we are attempting something a little unorthodox.You will step up to the outside of this home. The detail shows the second floor observation deck (on the right) and the icf wall + interior concrete slab (on the left). i am looking for a...