I still have doubt about the question. I wouldn't dare to deny the contractor request based on what I supose to be obvious, because I have already faced situations on which was apparent obvious was not what I think it was. On one hand the contractor has to follow the material specification, on...
My question is if I can replace the specified fiber which is core filled with gel by dry core filled with absorvent powder and still have the suitable protection considering application in flood areas.
Thanks
I am working in a fiber optic project, it is an outside plant trunking application and the fiber goes inside PEAD tube. Since there are areas which can be affected by floods, the fiber specifications preview loose tubes filled with gel. However, the contractor claimed that his supplier doesn’t...