Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. davidcamell

    Heat recovery

    What isn't mentioned is the possibility to take LATENT load out of the incoming OA (in other words, moisture). 90 deg humid air takes a lot more cooling to get down to 55 than 90 deg dry air. An energy recovery unit with a desiccant energy recovery wheel can help pre-"dry" the OA with the...
  2. davidcamell

    Air Balancing in Pharma

    If so much of the air is recirculate (correct me if I'm wrong: room air and corridor air mix at the unit before being redistributed?), then what is the goal in keeping a higher differential pressure in the corridor? Also, are there terminal boxes? Are they variable volume? I might be...

Part and Inventory Search