Mango,
The problem is that we (as a company) filled a need for a product by using a company whos bread-n-butter was nothing but this. Now this company is slacking, but we still need the product. I don't have time to fully reverse-engineer every single component, but I also need a way to tell...
I am having a problem convincing Sr. Engineers that I can compile a set of general fab drawings, with critical items detailed, and still be within standard. I don't want, or have time to model and BOM every nut and bolt. BTW, we are talking about a 40' x 10' x 10' structure. I need to make...