For the weld of the repad to the branch pipe, 328.5.4(e) states that (1) a full penetration fillet, or (2) fillet weld shall be used and refers to sketch 5.
My question is can the fillet weld (option 2, of e) be used on the other repad sketches such as 3, and 4?