thanks for the section. i had it right in front of me but didn't see it.
is shear friction added to appendix d in 08? i don't think CBC 07 which uses IBC 06 uses 318-08, so i don't know if that would be allowed.
the base plate is designed by the metal building supplier so i have no control over that. do you know what section of the IBC allows waive ductile if breakout is 2.5 times demand? is this in ACI 08 and not 05? i think 2007 CBC uses 2006 IBC which uses ACI 05 and not 08 thanks for your input
am i correct in assuming that if the capacity of the concrete (50k) exceeds the actual load (46k), i still have to design the concrete up to the steel capacity (80k)? i want to be sure because i am having to increase the ftg sizes to make this happen, and i see no way to make @ 3' diameter...
do you have any thoughts about what is the controlling factor that would make it ductile? I have been trying different s spacings and supplemental reinforcing conditions as well as f'c but doesn't seem to make much difference.
I am trying out Quick Anchor to design anchor bolts for a steel building per ACI Appendix D. In the output i am getting a value for tension and shear x and shear y, but each has the "Brittle failure - not suitable for SDC C or above." note. I can not see in appendix D what this is. Has anyone...