lets say a 300ft, 9.5" hole, OHGP with 40/60 propant, CaCl2 11.6ppg brine.
Just want to know how to calculate the basic volume of gravel to fill the hole minus screens. I know this has to be a very easy basic calculation but for the life of me I don't know what to do. I'm new to this, drilling...
Hi all, I need some help yet again. How does one calculate
1.the volume or gravel / slurry required to fill the hole in a gravel pack
2.the volume of brine required to complete the well
3.volume of base oil needed
Hi all, I'm a completions engineer trainee and I really need some help. I know the basics, how hydrocarbon is produced, parts of a rig, how to read reports. The problem is if I am to design a completion I don't know where to start calculating amount of tubing, propant, brine, base oil. I'm lost...