The marsh land is federally regulated and it is highly doubtful that they would accept a concrete channel bisecting their sacred land. It will be much more likely to be permitted keeping it a soft-bottom ditch.
Thanks though!
I am designing a flood channel that will outlet in an extremely environmentally sensitive marsh area. The portion of my channel that must extend into the marsh will be a trench approximately 10 to 15 feet wide and 300-feet long. Do to the environmental concerns, I want to minimize my footprint...
I am designing a flood channel that will outlet in an extremely environmentally sensitive marsh area. The portion of my channel that must extend into the marsh will be a trench approximately 10 to 15 feet wide and 300-feet long. Do to the environmental concerns, I want to minimize my footprint...