  1. sftyvlv

    cellulosic and low hydrogen electrodes

    Stanweld, I mean cellulosic rods used from the root pass right through to the cap. Why can they do this in NG piping and not process or power piping. If I misunderstood you please elaborate. Thanks Sftyvlv
  2. sftyvlv

    cellulosic and low hydrogen electrodes

    Why can cellulosic electrodes (root,fill and cap) be used on natural gas transmission lines and not used in process or power piping. Why one and not the other. Hydrogen embrittlement comes to mind.....must be something else? Sftyvlv
  3. sftyvlv

    socket weld flange vs slip on flange

    What are the advantages or disadvantages of both? Why not just use socket weld flange for everything? Sftyvlv
  4. sftyvlv

    aws 8010

    currently we are using an F4 SMAW (root,fill and cap)procedure on a job welding a335 p11 5 inch double extra heavy skid piping for a reheat furnace. Our welders are having trouble rooting this v groove joint and I'm wondering if using an approved procedure using aws 8010 as a root pass might be...
  5. sftyvlv

    vessel without proper construction tag

    To All: I'm very sorry, I did not intend to argue this question, your expertise is highly valued and I do not mean to upset anyone. I have seen "air pig" style manifolds from a manufacturer with a "U" stamp and tag verifying the specifications I first listed. I assumed a "backyard" manifold...
  6. sftyvlv

    vessel without proper construction tag

    Duwe6, I am aware of this and that the poorest weld may infact hold indefinately. My point being that this vessel was not constructed to code and if in fact it need be whats to stop anyone else from fabricating whatever they want with whatever material they want and weld it anyway they want. The...
  7. sftyvlv

    vessel without proper construction tag

    This vessel would be your typical "air pig" style receiver/manifold and yes it was constructed of 6" or larger pipe and yes I believe it carried over 100 psi compressed air. It's connection to plant air is from compressed air hose and "chicago" type coupler. I see this all the time in many...
  8. sftyvlv

    vessel without proper construction tag

    Hi folks: I've seen this before but hadn't thought much about it because nobody seems to care. Having said that, on several occasions I've seen in use a compressed air manifold with a receiver, with 8 outlets on it or so. Upon further investigation, noticed no construction tag on it and nothing...
  9. sftyvlv

    welding sa387 Gr2 to sa240 304l, what filler metal ?

    We are doing this procedure for our mechanical contractor. Currently we maybe using it under B31.1 in a high temp high pressure steam application. Thanks Sftyvlv
  10. sftyvlv

    welding sa387 Gr2 to sa240 304l, what filler metal ?

    My QC and I are developing a PQR/WPS to weld the afformentioned what do you recommend? GTAW root, SMAW fill/cap Thanks Sftyvlv
  11. sftyvlv

    transition temperatures for a312 stainless

    On welding pipe made with this material, what would should my interpass temperature be? sftyvlv
  12. sftyvlv

    transition temperatures for a312 stainless

    vesselfab I believe you are correct, it is a312-tp304. thanks Sftyvlv
  13. sftyvlv

    transition temperatures for a312 stainless

    Sorry Metengr, what I ment to say was A304 pipe. I thought a312 was the material group and covered a304 (304 being the grade). Thanks Sftyvlv
  14. sftyvlv

    transition temperatures for a312 stainless

    Where can I find transition temps for a312 in the code books. I'm just starting as a level 1 welding inspector,QC (Canada) and just learning. Thanks Sftyvlv
  15. sftyvlv

    instead of Rt...

    On a recent post I mentioned a condensor line that was Rt'd instead of a hydro (because the line could not be isolated). My question is could any other form of ndt been done. This line did not meet the requirements of Rt under B31.1. In the previous post I was asked if the customer had...
  16. sftyvlv

    why was this a cut out?

    Yes this is to B31.1 Sftyvlv
  17. sftyvlv

    why was this a cut out?

    I have a 20"condensate line that terminates in the main condensor of a 500mw steam turbine. The pipe is A106 sch 40 20". The wps calls for a gtaw root pass with Er70s-2 wire and smaw 7018 root, fill and cap. The service temp and pressure are 50 psig and 350 deg F. A hydrostatic test was...
  18. sftyvlv

    corner joints

    Why does the code not allow corner joints in boiler pressure vessel construction? Specifically in firebox firetube boilers. sftyvlv
  19. sftyvlv

    socket weld fittings (fitting allowance)

    What is the min allowable pipe to fitting engagement for a socket weld? Thanks Sftyvlv
  20. sftyvlv

    interpass temp

    Thanks, for the info. I'm new at metalurgy and I've hardly scratched the surface on the wide variety of topics that relate to this field. I'm a red seal pipewelder in Ontario,working at a coal fired power station,and am curious to the "hows" and "whys" of welding metallurgy. I have ASME section...