  1. jdyee

    Capacitors on the transmission system

    Depend on your system criteria. You should check capacitor switching capability, size, harmonics, loss saving, reactive reserve (PV-QV curve), delta V (for switching capability), expandable rack size for the future expansion... Depend on what type of capacitors and what your purpose of using...
  2. jdyee

    Open/close breaker rating for a ring bus configuration

    I am comparing the maximum loading of the line and the breaker rating if one breaker is open for a fault.
  3. jdyee

    Transfer Capability Analysis

    I never do a transfer analysis before. Can anyone tell me how to do a completed transfer analysis study? Thanks.
  4. jdyee

    Open/close breaker rating for a ring bus configuration

    Sorry for not being clear here. Let see if I can explain to you my question. When I run contingency analysis, if there is an overload on a breaker in a ring bus or breaker and half station, the real rating of a breaker in a ring bus station should be almost double of its thermal rating I...
  5. jdyee

    Open/close breaker rating for a ring bus configuration

    Can anyone help me to calculate the open or close breaker rating for a ring bus configuration or a breaker and 1/2 configuration?