All true. However they were OK with the idea at the start and didn't raise an issue until full design was completed. I am in reviewer hell here with Army Corps, EPA, The City, and The County. I am in for about 18 months since inception for 1800 feet of road and I really don't want to start over...
I am doing a road design serving about 65 acers zoned office/lab. The property falls away from the road it fronts on. I designed the sanitary as a 12" to take advantage of a flatter minimum slope (0.22% rather than 0.44% for an 8")to extend sanitary as far as possible into the acerage with...