Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. AlfredDFW

    Mortar exposure

    The stone is limestone and the approximate time for the lake (creek)to be refilled will be around one week. As for the variation of temperature, the water is mostly kind of stagnant, doesn't have aggressive flow. freezing temperatures here in Texas don't last too long. I'm planning to use type...
  2. AlfredDFW

    Mortar exposure

    What kind of mortar will be appropriate to use for permanent exposure to water? I have a project where a stone wall is going to be inside of a creek.
  3. AlfredDFW

    detention pond discharge rate

    I have a rectangular-shape in plan detention pond with sloping sides (4H: 1V) that is discharging through an orifice. I have inflow volumes of water at increments of 10mins. up to two hours, an orifice size at certain elevation (for water discharge to the storm system). Do you know of a program...
  4. AlfredDFW

    Cable suspended structures

    I have a cable suspended roof, with open anchor sockets and the cables are structural galvanized helical strands . The roof has valleys and ridges; it's kind of odd but the cables anchored at the ridges have some rusting (right now I don't know how severe it is)all along their length; the cables...

Part and Inventory Search