Thanks VEIBLL,
This is supposed to be an automated test except for the operator cycling the power switch once. I also thought that switching leads/connections might be the best, but would add time. I did not know if there was a special type of relay or contactor for reliably making the safety...
I must do Hi-Pot and functional test on a product.
The product produces nasty -6KV transients on the neutral side. For Hi-pot testing I must keep the ground and neutral isolated. The product chassis must also be isolated from the system to properly measure ground continuity with the hi-pot...