  1. MLPeacock

    Electrical power connection failure

    It may have been lightly loaded when thermal scanned. Was the clamp on amperage reading taken at the time and followed with torgue test?
  2. MLPeacock

    ISO PHASE GROUNDING BOLT HEATING

    thread238-136455 the ISO Phase Bolt heating at this point is because it is carrying more than its share of the current and you are satisfied that these bolts are properely tightend the the finale adjustment for the hot one is slightly loosen the hotest bolt to reduce the current and thus...