Hello
I am designing a two strand end drive chain conveyor to carry a 2000# load at aprrox. 50 Fpm. I have selected the carrier chain and sized the drive etc. My question is, what criteria do I use to select the head sprockets pitch dia.
I realize that if the pitch dia. is too large this will...