Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. bullgear17

    Cooling Tower Equalizing Line

    RobsVette, i totally agree with you as i just wanted to get a second opinion about my justification to my team. i also think that it is not totally stagnant as water is being evaporated as well as refilled on top of the difference in piping configuration to create a flow in between. another...
  2. bullgear17

    Cooling Tower Blowdown Best Practice

    I am planning to relocate the cooling tower blowdown line of our existing system. I believe that the current installation is not the best industry practice in terms of design and operations as it is connected on top of the pipe instead of the bottom of the pipe. In addition to that, the blowdown...
  3. bullgear17

    Cooling Tower Equalizing Line

    Hi cry22. Yes, that is correct. There was a recommendation from the water treatment supplier to connect the equalizing line to the supply line to promote flow and eliminate water stagnant on the equalizing line. The existing equalizing line is mild steel pipe.
  4. bullgear17

    Cooling Tower Equalizing Line

    Hi guys, I wanted to get some help to check if connecting the cooling tower equalizing line to the supply line (cooling tower outgoing) will have significant effect on the system in terms of flow. The reason for this is that the water treatment vendor suggest that the equalizing line is...

Part and Inventory Search