JamesDUK,
If not already done, would suggest you to ensure that the setting of the pr control in the spill back line (connected to the suction line of the GP) is such that it corresponds with the CP characteristic curve for a flow of 9 m3/hr ! If the pr setting is high, the pusations can still...