Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: honkymofo
  • Order by date
  1. honkymofo

    ABC Slot Cut Excavations

    The initial cut will be a 45 degrees (1:1), descending inward from the property line from a height of 5' to 0, 5' inside the property line. This cut is considered temporarily stable and OSHA-compliant; no SS analysis is required Once this initial cut is achieved, it is necessary to remove...
  2. honkymofo

    ABC Slot Cut Excavations

    I need to calculate the maximum individual widths for an A-B-C slot cut excavation based on a safety factor of 1.5. I will be monitoring an excavation for a building near the property line, the height of the cuts will be an OSHA-compliant 5'. I have all the lab data such as phi, C and unit...

Part and Inventory Search