Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: ASA20
  • Order by date
  1. ASA20

    ASME B31.1 Application

    Hi All, Trust you are all keeping safe in this peculiar times. Please I will like to request for your advise on a technical information I came across while reviewing the piping Material class from a client. The statement reads "ASME B31.1 for Hull piping (Where there is no interface with...
  2. ASA20

    Large Spectacle Blinds (Figures 8)

    Admt63 Much information on the project will be required to really find a good reason to convince your client, also i will want to know the reason for his choice of figure 8 spectacle blind, but Weight limitations and the associated difficulty of handling heavy pieces in the field are the...
  3. ASA20

    Relief system piping

    TD2K, The ristriction orifice is a flow measuring instrument installed on the process line and my job notes stipulates a pipe striaght run before and after the orifice should have a distance of 7930mm and 1270mm.This arrangement is part of a relief system ,that was why i posted it with that...
  4. ASA20

    Relief system piping

    I have space constrain on a relief platform which has a lenght of 6000mm,i want to carry out piping layout of the relief system which has an 8" 900#RJ ristriction orifice which is placed inbetween a 10" ball valve and an 8" ball valve.I have to considered the straight run reqiurement of 7930mm...

Part and Inventory Search