Hi All,
Trust you are all keeping safe in this peculiar times.
Please I will like to request for your advise on a technical information I came across while reviewing the piping Material class from a client.
The statement reads "ASME B31.1 for Hull piping (Where there is no interface with...
Admt63
Much information on the project will be required to really find a good reason to convince your client, also i will want to know the reason for his choice of figure 8 spectacle blind, but Weight limitations and the associated difficulty of handling heavy pieces in the field are the...
TD2K,
The ristriction orifice is a flow measuring instrument installed on the process line and my job notes stipulates a pipe striaght run before and after the orifice should have a distance of 7930mm and 1270mm.This arrangement is part of a relief system ,that was why i posted it with that...
I have space constrain on a relief platform which has a lenght of 6000mm,i want to carry out piping layout of the relief system which has an 8" 900#RJ ristriction orifice which is placed inbetween a 10" ball valve and an 8" ball valve.I have to considered the straight run reqiurement of 7930mm...