Hi:
I live in a rural area with severely attenuated utility services.
The local power co. wanted an exorbitant amount to bring in 3 ph power for a small molding operation I used to run.
So I was forced to “make” my own.
Three capacitors are needed, one electrolytic for starting, typically 70 –...