Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. PE2015

    Miami Pedestrian Bridge, Part VII

    Were the pylon vertical PT rods installed through the deck? Photos of No.11 and 12 node appear to show the PVC pipes extend above the deck indicating the PT extension bar, PT back plate, and nut have not been installed. Dwg B-46 and B-47 show four 4" ID reinforcement sleeves for 1-3/8" PT bars...
  2. PE2015

    Miami Pedestrian Bridge, Part V

    Video just posted on utube appears to shown bridge the morning of collapse At 8:53 AM, westbound travel appears to show worker on south end canopy. No "apparent" north deck blemishes or cracks---video is fuzzy somewhat. At 9:39 AM, eastbound travel shows crane setting up, maybe the man lift...
  3. PE2015

    Miami Pedestrian Bridge, Part III

    In the attached utube video posted today, there may be a crack, or a construction wire/cable, several feet south of where #9 and #10 connect to the lower deck. The crack or wire appears to past through, or over, the floor drain. www.youtube.com/watch?v=SBoE34-WZoE

Part and Inventory Search