Please see attached file.http://files.engineering.com/getfile.aspx?folder=4d2c115d-ed4c-4d0b-adfe-374841bf5bbb&file=Post-Glover-HR002-05_Hi_Resis_Grounding.pdf
All,
Thanks for all your reply.
I suggested to Mike just reply to supervisor in a very simple sentenses.
"Supervisor's comments are purely unfounded's proofs.
These were soley his personal perceptions and speculations.
His comments were expressed out of personal frustration due to the fact
that...
All,
It is odd and funny to see this close-out Performance Review comments. This person is leaving his current supervisor for better opportunity in the same company.
I am not sure this supervisor knows what he is writing and back-fired on him. Has anyone of you ever seen this type of comments...
Try this approach.
1. Launch DOS Command Prompt
Start/Program/Accessories/Command Prompt
2. Dir C:\Folder-Path /O:N /S /B > C:\MyFolder.txt
The Foldername and Filename will be Output to MyFolder.txt file
3. Exit Dos Command Prompt
4. Window Explorer Look for the filename MyFolder.txt
5. Open...
Hi,
I got this from Areva and have not use it since 2007.
Please try this excel.
Alex Leehttp://files.engineering.com/getfile.aspx?folder=a94b2fb0-b54a-4ae7-973a-aaf80cf706a2&file=P633_test_tools-Farhad-Rev-01.xls
Pleasr8,
Hope this Excel program from GE will help you in your calculations and testing the T60 relay.
Thanks.
Alex
http://files.engineering.com/getfile.aspx?folder=e63dc5b4-3957-4694-b11a-befbff07ae63&file=t60diffsimulation.xls
Here is the NERC Link for the Electromagnetic Pulse
Report of the Commission to Assess the Threat to the
United States from Electromagnetic Pulse (EMP) Attack.
April 2008.
http://www.empcommission.org/docs/A2473-EMP_Commission-7MB.pdf
NERC System Disturbance Analysis: 1989 Geomagnetic
Storm...
Here is the NXTPhase CT Saturation Calculator.
Thanks
Alexhttp://files.engineering.com/getfile.aspx?folder=cf5e19c3-a341-4288-a36e-97f818c4e69b&file=CT_SAT_Calculator-IEEE-Version.xls
Try Areva Web site.
http://www.areva-td.com/solutions/US_930_NPAG.html
Just fill up the form an request Download or CD-ROM.
It is Free.
" Ordering the NPAG
Due to the popularity of this publication, the hard-copy version of the NPAG is no longer available. To receive the NPAG, by download or...
Please see attached document.
Hope this will answer part of your question.http://files.engineering.com/getfile.aspx?folder=b7018ec3-038e-4688-8a3a-7c3201de3a92&file=Fault-Io-Eng-Tips.doc
I believed your primary neutral is floating. The secondary no-load voltage is always higher than expected. This is normal. Is your transformer connections is Y-Y.
The measured voltage 250V at no-load is due to the third harmonic component.
The line-neutral voltage will be reduced to 240V once...
I am using Excel 2003 Visual Basic. I would like to know how to activate the "Data Tip Window". I used to have this ( Excel 2000 ) feature activated automatic when I place the cursor on the varible.
Can someone show me how to activate this Data Tip feature?
Thanks
Alex
Data Tips Window
A box...