Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. kirkussent

    Lindeberg Appendix 19C

    Question: Does anyone know how the Ratio of depth to diameter is traced? Is it from V/Vfull to A/A full or from Q/Qfull to A/Afull. This is from the graph located in Appendix 19c of Lindeberg. Thanks Kirkussent
  2. kirkussent

    H-20 loading for PVC pipe

    http://www.dot.ca.gov/hq/oppd/hdm/hdmtoc.htm Last page of Chapter 850 gives minimum covers forplastic pipe.
  3. kirkussent

    structural section

    I am designing a widening of the roadway and the manual for the city states that a soil report from a soil engineer be noted on the plans. The question is in our State, (California), "Soils engineer" is a Legal Term for a Geotechnical Engineer. I have done soil reports before for other cities in...
  4. kirkussent

    Roadway higher than driveways?

    What I have seen in Arizona residential subdivisions has been the use of detention basins. These detention basins catch the water during the monsoon season and also serve as parks for the residents.
  5. kirkussent

    precise grading question

    Here is Caltrans Staking Manual, It has all kind of terms and information thats good. Kirkussent http://www.dot.ca.gov/hq/esc/geometronics/StakingManual12.pdf

Part and Inventory Search