Key word: NFPA110 - IEEE446- max %V & % F dip- S"k (Transient short Circuit Power) - KVA motor starting - Droop & Isochronous
Sir
Herein some questions on standards defining dynamics on a power generation / standby power /emergency power projects design: I'm trying to be fixed on the choice of...
I have some experience with this kind of problem, what kind of winding connection in the transformer you have? i beleive that a WYE-WYE connection will transmit the unbalance from medieum volatge to the generator bars and it should be better to have a WYE-Delta connection
Also, i beleive tha MG...
busbar,
your reight but this project will be a turned key project, and as i'm working for a geverment company, the amoount of MW will be let's say 600MW, but how many turbine (4*120MW or 3*180Mw for example) will be calculated on the KW installed price, so this range is to have the most...
Hi every body
I'm preparing a bid for a generator of a 120 to 180MW gas turbine ( frame9, V94.2,…), you find her my proposal for the excitation system specification
Can you comment this to enhance it??? Is this applicable for the standardized products on the market specially for this...
hi
i just start with pro/e
can some one telle me if it'is possible to copy a drawing from this enviromment to other under windows ( word, autocad,....) and is there any labrary for electrical drawing ( one lines diagramme, logics,...)
Hi gentlemans
I have many gas turbine that comes to end of life,
can i use there generator as synchronous compensator? are the cranking motor typically able to run the machine until the full speed? is they will be any special specification for the step up transformer? ( because it will be loaded...