    Calculating wetted perimeter for pipes in Time of Concentration

    I had some design calculation spred sheet, for the design of drainage network, with indian standards SP35, for calculating pipe sizes,at the same time checking the Max.possble dicharge, Minimum & Max. velocities aganist the slopes. RAVI
  2. sarala

    non existing cross sections method of measurment

    The following formulae solve the above problem v1 = Dry density (loaded in truck ) --- ---------------------------------- v2 Dry density ( in dreded area ) v1 = volume of material excavated v2 = volume of material loaded The following data required Dry density : This can...