hmchi,
I personally think that the solution will be best with at least two portions of Power Generation Partial power you can take from utility company and for the essential power you have to set up a Power Generation. Like in yr case you have requirement of 250 MW total, combined on 110...
Hi 144X,
Yes I also know some brands in my country which clears all tests after manufacturing and after few year the insulation depriciate very rapidly, What I believe is that the type test of the Manufactured good was conducted only on sample Lenght or Equipments, and most of the manufacturer...
Hi STEVWRI,
Mostly the medium voltage disconnectors are locked by Blocking magnets, Where as High voltage manual drive Disconnectors are mostly available with Padlocking arrangement on both Extremes (Fully Open & Fully Closed). Can u give yr actual requirement why u need to lock that in ON...
Paul Ryan/Shaq,
I have been in the Installation & commisssioning of LV/MV/HV Switchgears for About 9 Years, We Normally Check the following for LV & MV Equipments and I believe this will give you very good idea about the health of your Equipment
Visual Checks:
Any Deformation of Fix/ Moving...
Dear friend,
This usually happens in the line, You can check the fault impedance in P 441, If you have feeded the line parameters then you can also find the distance. What is the total lenght of the line if possible arrange petroling in the night time and closely look the insulators. The...