Hi All!
Something I've never had to do so a little lost on who is responsible. I'm specifying a concrete mis with 6% air entrainment but the batch plant is only offering a mix of 2% and won't provide an air entrainment add mix design. The concrete contractor says he won't add a the mix in the...