Thanks again for your previous explanation, it really helped clarify things.
Just to confirm that I’ve understood the setup correctly:
I’m replacing one or more columns at the 2nd floor level, and the load above (roof slab) must be temporarily supported.
Since shoring from below isn’t an...
Hi everyone,
I’m looking for structural input regarding shoring strategy during the replacement of one or more concrete columns in a reinforced concrete in the 2nd floor residential building located in seismic zone.
Key context:
The building has two floors above ground level,
A few columns at...