  1. H

    Wer H2S at elevated temperatures debate

    Hey guys, I am having today three scenarios entitling the wet h2s cracking consideration: 1- I am having a stream at HCU operating at 230 Deg C and pressure of 2200 psia, with water fraction of 0.38% but as per the heat mass balance no liquid H2O flowrate is present, so shall we consider wet...
  2. H

    NACE Requirements for completely Cladded pressure vessel in severe sour stream

    Great! I would agree with that, because complete cladding is totally isolating the backing metal from the inside service. Even the produced hydrogen as a corrosion reaction product, won’t be able to reach the backing steel because it would be difficult to pass the interface between the clad and...
  3. H

    NACE Requirements for completely Cladded pressure vessel in severe sour stream

    This is the thing, our client spec did not mention anything in that regard, so they are keeping it open for the design company. Yesterday I checked their old projects, they only specify NACE requirements from chemical comp. and hardness only for the cladding not the backing CS. I was thinking...
  4. H

    NACE Requirements for completely Cladded pressure vessel in severe sour stream

    Hey everyone, I am honored to join you here. I am a materials engineer, I had project having 3 phase separator projects in GOSP, so this separator is totally cladded from as per my selection based on the severity of sour medium based on NACE 8x194 category evaluation. So based on API SP...