We are constructing a new concrete baffle wall inside an existing aeration basin at a WWTP. The wall is done in two pours, first is the 1' tall x 3' wide footer poured on existing concrete floor, then vertical wall is poured after. The footer was poured with #5 vertical dowels extending up 24"...