If a control valve has a CV of say 300, with the valve fully open the flow is 800m3/hr. Does this mean that if the valve was only open 50%, the CV would be 150 and the flow would be 400m3/hr. At 25 % would the cv be 75 and the flow 200m3/hr and so on.
Thankyou.