Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations LittleInch on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. RobSmith1975

    ASME B31.4 Fracture Control Program

    Thanks for all your help guys, much appreciated
  2. RobSmith1975

    ASME B31.4 Fracture Control Program

    I perhaps should have worded my initial post better. I was hoping to find written documentation or an example from someone of a fracture control program already implemented. The fluid is propane (C3) that is to be transferred between plants at a design pressure of 35 Bar. There is a redundant...
  3. RobSmith1975

    ASME B31.4 Fracture Control Program

    Hi littleInch The section I was quoting is from ASME B31.4 - 2016 edition
  4. RobSmith1975

    ASME B31.4 Fracture Control Program

    Hi guys Thanks for the responses. The minimum design temperature for the line is -5C. However there is the risk when de-energising the line of adiabatic flash. I'm familiar with the methods and requirements of testing, it was the term "fracture control program" that bothered me as I...
  5. RobSmith1975

    ASME B31.4 Fracture Control Program

    Hi I'm writing a report to reinstate a redundant pipeline.. During process studies it has been concluded that the material could experience a minimum design temperature of -42C if the piping is subject to adiabatic flash at atmospheric pressure, this is the fluid boiling at atmospheric pressure...

Part and Inventory Search

Back
Top